The Precision Process
We execute a meticulous installation sequence designed for maximum durability and aesthetic excellence.
01
Diamond Grinding
Professional diamond grinding to prepare the concrete surface for a flawless epoxy bond.
02
Surface Repair
Repairing any structural imperfections to ensure a perfectly level and smooth finish.
03
Base Coat
Application of a high-performance epoxy base coat for superior chemical resistance.
04
Full-Flake
Application of a full-flake decorative coating for a premium, high-gloss finish.
05
Top Coat
Final clear top coat for maximum protection and a long-lasting, high-gloss finish.
Frequently Asked Questions
How long does the installation process take?
Installation timelines vary based on surface preparation and project size. We typically complete a full-flake or metallic epoxy floor in 3-5 days, including surface grinding and curing.
What is the difference between full-flake and metallic epoxy?
Full-flake epoxy features a deep, industrial texture with embedded flakes for a premium, non-slip finish. Metallic epoxy includes metallic flakes and pigments for a high-gloss, luxury aesthetic.
Do you offer maintenance and repair services?
Yes. We provide comprehensive maintenance plans and emergency repair services for all our installations, ensuring your investment remains in pristine condition for years to come.
Is professional surface preparation required?
Yes. Proper surface preparation is critical for a long-lasting finish. We perform diamond grinding and cleaning to ensure a smooth, even base for our high-performance coatings.